Foundation2–6 weeksLow5S Workplace OrganisationPut the workplace in order - sort, set, shine, standardise, sustain - so that waste becomes visible and a standard can hold.
Foundation3–5 daysHighKaizen EventA focused one-week team effort that redesigns one process and implements the change before the week ends.
Foundation1–2 hoursLowGemba WalkGo and see the real work at the real place, with the people doing it, before deciding anything.
Foundation2–4 hoursLowWaste WalkA structured hunt for the eight wastes, walking the process against a checklist so waste becomes countable instead of abstract.
Flow1–3 weeksMediumValue Stream MappingMap the whole door-to-door flow of material and information, with process times and waiting times, to find where lead time really comes from.
Flow1–2 hoursLowSIPOC Process MapA one-page map of Suppliers, Inputs, Process, Outputs and Customers that sets the boundary of an improvement before deeper mapping.
Flow1–2 weeksMediumTakt Time & Line BalancingSet the pace the customer demands, then redistribute work so each station fits inside that pace.
Flow1–3 daysLowSpaghetti DiagramDraw the actual path people or parts travel on a layout plan, then shorten it.
Flow2–6 weeksMediumKanban Pull SystemReplace push scheduling with a signal that authorises production only when downstream consumes - capping work in process.
Flow3–8 weeksHighHeijunka - Level LoadingSmooth the mix and volume of work over time so the process stops swinging between idle and overloaded.
Flow2–6 weeksMediumSMED - Quick ChangeoverCut changeover time by separating internal from external setup and converting as much as possible to external.
Flow1–3 weeksMediumStandard WorkDefine the current best way to do the work - with takt, sequence and standard inventory - as the baseline for every improvement.
Flow4–12 weeksHighOne-Piece Flow & Cell DesignArrange the steps of a product next to each other in sequence so one unit moves at a time, with no batched waiting.
Quality1–4 weeksLowPoka-Yoke - Mistake ProofingMake the error impossible, or make it obvious immediately, instead of asking people to be more careful.
Quality4–10 weeksHighJidoka - Build in QualityGive machines and people the ability to stop the line the moment an abnormality appears, so defects never travel downstream.
Quality2–4 weeksLowAndon - Visual SignalA signal everyone can see the moment normal is lost, with a defined response that arrives fast.
Quality3–9 monthsHighTPM - Total Productive MaintenancePut operators on basic care of their own equipment and use planned maintenance to eliminate unplanned breakdowns.
Quality2–4 weeksMediumFMEA - Failure Mode & Effects AnalysisList the ways a process can fail, score severity, occurrence and detection, and act on the highest risk first.
Problem solving1–2 hoursLow5 WhysAsk why repeatedly until you reach a cause you can act on, going down the chain instead of across the symptoms.
Problem solving1–3 hoursLowFishbone / Ishikawa DiagramOrganise every possible cause of a problem into branches so the team looks beyond the most obvious suspect.
Problem solving2–6 weeksMediumA3 Problem SolvingOne page that tells the whole story - background, current state, target, causes, countermeasures, plan - and forces thinking on a single sheet.
Problem solving1–4 weeks per loopLowPDCA CyclePlan, do, check, act - a short learning loop rather than a big project, so improvement keeps moving.
Problem solving3–6 monthsHighDMAIC ProjectThe Six Sigma roadmap - Define, Measure, Analyse, Improve, Control - for problems that need data and statistical proof.
Measurement1–3 daysLowPareto AnalysisRank causes by their contribution so the team attacks the 20% of causes behind most of the effect.
Measurement2–4 weeksMediumOEE - Overall Equipment EffectivenessAvailability times performance times quality: one number that shows where equipment capacity is actually lost.
Measurement3–6 weeksMediumSPC - Control ChartsSeparate normal variation from a signal that something changed, so people act on causes instead of on noise.
Measurement1–2 weeksMediumMSA / Gage R&RProve that the measurement system can see the difference you are trying to manage before you trust any data from it.
Measurement1–2 weeksMediumProcess Capability (Cp / Cpk)Compare the process spread with the specification to see whether the process can meet the requirement at all.
Measurement4–10 weeksHighDesign of ExperimentsChange several factors in a planned pattern to learn which ones matter and how they interact, with far fewer trials than one-factor testing.
Measurement3–10 daysLowTime & Motion StudyMeasure the real time each element takes so improvement work rests on observed facts.
Strategy3–6 monthsHighHoshin KanriTurn a few breakthrough objectives into work that reaches every level, through catchball rather than top-down targets.
StrategyOngoingMediumImprovement KataA daily practice of small experiments toward a target condition, which builds improvement capability in people, not only results in processes.
Strategy3–8 weeksLowLeader Standard WorkA short, visible routine of daily checks leaders perform, so new standards stay alive after the project ends.
Strategy1–3 weeksLowObeya - Visual War RoomOne room, one wall, one truth: the project status, problems and plan visible to everyone so decisions happen in minutes.
Foundation1–3 weeksLowVisual ManagementMake normal and abnormal obvious at a glance so anyone walking past can see the status without asking.
Foundation2–6 weeksMediumYokoten - Horizontal DeploymentTake a fix that worked in one place and copy it to every similar area, rather than letting each team rediscover it.
Flow2–4 weeksMediumWater Spider (Mizusumashi)A dedicated runner on a timed route keeps parts and information flowing to the line so operators never leave their work.
Flow1–3 weeksLowFIFO LaneA fixed-capacity first-in-first-out corridor between two steps that caps the inventory and keeps the sequence intact.
Flow2–6 weeksMediumCONWIPA simpler pull than kanban: one shared limit on total work in process, with the next job released only when one leaves.
Measurement2–5 daysLowCheck SheetA simple structured form to tally what is happening - by type, time or location - so a process with no data gets a first, trusted set.
Measurement1–3 daysLowHistogramA frequency distribution that shows the shape and spread of a metric, revealing centre, variation and hidden populations.
Measurement1–3 weeksMediumVoice of the CustomerCollect what customers actually need and complain about, in their own words, so requirements stop being assumptions.
Problem solving1–2 daysLowCTQ TreeTurn a vague customer requirement into specific, measurable drivers so the team knows exactly what to improve.
Problem solving2–8 weeksHigh8D Problem SolvingA team-based, eight-step method for complex failures - contain the damage first, then find and kill the root cause permanently.
Strategy1–3 monthsHighKaikaku - Radical ChangeA deliberate, step-change redesign of a whole value stream when incremental kaizen can no longer reach the target.
Strategy1–2 hoursLowHansei - ReflectionA structured look back at what went wrong and what to learn, done at the end of every project, so failure feeds the next improvement.
Strategy1–3 weeksLowTWI Job InstructionTrain one element at a time to a written standard, demonstrating and checking until the trainee can do it without help.