5 Whys
Problem solvingなぜなぜ分析
Asking why repeatedly, verifying each answer at the gemba, until the actionable system cause is reached.
Machine stopped, because it jammed, because chips built up, because the guard was missing.
Glossary & dictionary
Search in English, romaji or kanji. Every entry has a plain meaning and a workplace example.
76 terms
A single-sheet problem solving and communication format on A3 paper: background, current state, target, causes, countermeasures, plan.
One page that gets a countermeasure approved in a ten-minute review.
行灯andon
A visible signal — light, board or screen — that shows the state of the process and calls for help.
A green-amber-red lamp above each station at the line.
Critical to Quality — the measurable characteristic the customer genuinely cares about, translated from their own words.
'It feels solid' becomes a torque specification with a tolerance.
キャッチボールkyatchiboru
The back-and-forth negotiation of targets between levels of management, so plans are owned rather than imposed.
A department proposes a target, the director responds, and both agree.
着々chaku chaku
A cell layout where the operator moves from machine to machine and each machine unloads its own finished part.
One operator walks a U-cell, loading three machines in sequence.
Normal variation inherent in the process. Reacting to it makes things worse; the process must be changed instead.
Cycle times scattering between 40 and 44 seconds every day.
A time-ordered plot with statistically calculated limits that separates normal variation from signals of change.
An Xbar-R chart with one point beyond the upper limit at 14:20.
An action aimed at the verified cause. Lean prefers the word to 'solution', which suggests the problem is closed.
Rearranging the workstation so the wrong part cannot be reached.
Capability indices comparing process spread (Cp) and centred spread (Cpk) with the specification limits.
Cp 1.8 with Cpk 0.9 means the spread is fine but the process is off-centre.
サイクルタイム
The time between one unit coming out of a process and the next unit coming out.
One finished unit every 42 seconds at the end of the line.
Define, Measure, Analyse, Design, Verify — the roadmap for designing a new process or product to Six Sigma quality.
Designing a new packing line before it is built.
Define, Measure, Analyse, Improve, Control — the Six Sigma project roadmap for existing processes.
A four-month project to cut solder defects from 3% to below 0.5%.
Design of Experiments — a planned set of trials that reveals which factors matter and how they interact.
Eight trials instead of forty, testing three factors at two levels.
Defects Per Million Opportunities — a defect rate normalised by the number of chances for a defect per unit.
12 defects across 5,000 units with 4 opportunities each: 600 DPMO.
Failure Mode and Effects Analysis — ranking potential failures by severity, occurrence and detection to focus prevention.
RPN 168 for a missing weld, addressed with a sensor and a check.
An Ishikawa cause-and-effect diagram branching possible causes into categories such as machine, method, material and people.
Six branches of possible causes for print misregistration.
5S
Seiri, seiton, seiso, seiketsu, shitsuke — sort, set in order, shine, standardise, sustain.
A shadow board where every tool has one home and a missing tool is visible.
A study separating repeatability (same appraiser, same gauge) from reproducibility (different appraisers).
Three operators measuring ten parts three times, blind.
現場genba
The real place where value is created — the line, the desk, the ward. Improvement decisions are made there, with the facts found there.
A manager walks the packing line instead of reading the weekly report about it.
現物genbutsu
The actual thing — the physical part or product being examined, rather than a report or a model of it.
Laying the rejected parts on the table to see the defect yourself.
現地現物genchi genbutsu
Go and see for yourself. Understand the actual situation at the actual place before concluding anything.
Instead of asking why parts are late, you follow a part through the process.
反省hansei
Structured reflection — honest acknowledgement of what went wrong and why, before moving on.
A project close-out where the team names its own mistakes first.
平準化heijunka
Levelling the volume and mix of production over time so the process runs at a steady, sustainable pace.
Building a repeating A-A-B-C sequence instead of all A's on Monday.
方針管理hoshin kanri
Policy deployment — cascading a few breakthrough objectives through the organisation with aligned targets and catchball.
A three-year goal broken into annual targets per department.
A statistical test judging whether an observed difference is real or attributable to chance, with a stated confidence.
A t-test comparing cycle times before and after a change.
自働化jidoka
Automation with a human touch — machines and people stop the process immediately when an abnormality occurs.
A sensor stops the press when a part is loaded crooked.
Never pass a defect downstream: stop, fix the cause, then restart. The foundation of built-in quality.
The line stops within one unit of a defect being made.
ジャストインタイム
Producing what the customer needs, when needed, in the amount needed — with minimal stock ahead of the customer.
Parts arrive at the line four hours before use, not four weeks.
改革kaikaku
Radical, breakthrough change rather than incremental improvement — the opposite end of the kaizen spectrum.
Replacing a batch line with a single-piece flow cell.
改善kaizen
Continuous improvement by everyone, every day — small changes made by the people who do the work, rather than one large project.
Operators move a tool rack two metres closer and cut 40 seconds from every cycle.
紙芝居kamishibai
A card-based audit system where leaders periodically check specific standards, turning auditing into a routine.
A red and green card board checked each shift by the team lead.
看板kanban
A signal that authorises replenishment or production, usually a card attached to a standard container.
A card returns to the previous process only when a container is consumed.
型kata
A structured practice pattern that builds capability through repetition, as in the improvement kata and coaching kata.
A daily fifteen-minute experiment review with a coach.
リードタイム
The total time from a customer request to delivery, including all waiting. The number customers experience.
Order placed Monday, delivered the following Thursday: nine days.
Lead time equals work in process divided by throughput. Cutting WIP cuts waiting time.
80 units in process at 20 units a day means four days of lead time.
Measurement System Analysis — proving the gauge and the appraisers can see the variation you need to manage.
A Gage R&R showing 8% of variation from the measurement system.
A fixed route that collects or delivers material on a repeating schedule, replacing ad hoc trips.
A tugger delivers kits to five stations every 30 minutes.
無駄muda
Waste — any activity that consumes resources without creating value for the customer.
Double handling of a pallet between two warehouses.
斑mura
Unevenness — variation in workload, volume or quality that forces the process to swing between idle and overloaded.
All month-end invoices arrive in the last three days.
無理muri
Overburden — asking people or machines to work beyond a sustainable load, which produces defects and breakdowns.
One operator loading two machines with no time between cycles.
流しnagara
Doing work while something else is in process — for example inspection performed during the machining cycle.
Checking the previous part while the next one is being cut.
根回しnemawashi
Quiet, informal consensus building before a decision is formally made, so implementation does not stall.
Talking to each affected team lead before the change is announced.
Overall Equipment Effectiveness — availability times performance times quality; the share of scheduled time that produces good parts.
Availability 88% x performance 92% x quality 97% = 78% OEE.
大部屋obeya
A big room where a project's plan, performance and problems are made visible so decisions happen quickly.
A war room wall with the plan, open issues and current metrics.
一個流れ
Moving work one unit at a time between steps, so waiting and work in process collapse.
One order passes through cutting, welding and packing without a batch queue.
Plan, Do, Check, Act — the learning loop behind every improvement, run in short cycles.
A two-week test of a new layout, measured, then standardised or reverted.
Roughly 80% of the effect comes from about 20% of the causes; a Pareto chart ranks causes to prove it.
Three defect types account for 84% of all rejects.
ポカヨケpoka yoke
Mistake proofing — a device or design that prevents an error from being made or makes it immediately obvious.
A fixture that physically only accepts the correct orientation.
ポカヨケpoka yoke
A device or design that prevents a specific error, or stops the process the instant it happens.
A jig with a pin that only fits the correct part.
引張り
Downstream consumption triggers upstream production, rather than a schedule pushing work forward.
The machining cell only starts a batch when the assembly cell signals.
Risk Priority Number — severity times occurrence times detection, used to rank failure modes in an FMEA.
8 x 3 x 7 = 168.
Modelling the relationship between input variables and an output, to predict and to prioritise the inputs that matter.
Yield predicted from oven temperature and line speed.
The probability a unit passes every step without any rework or scrap — the yields of each step multiplied.
0.98 x 0.95 x 0.99 = 92% RTY across three steps.
The system condition that, if changed, prevents the problem from recurring — not the person closest to it.
A picking list that omits part numbers, not the picker who mis-picked.
Suppliers, Inputs, Process, Outputs, Customers — a one-page map defining the boundary of a process.
Five to seven macro steps with inputs, outputs and owners named.
Single-Minute Exchange of Die — changeover in under ten minutes, achieved by converting internal setup to external.
A pre-staged tool cart that cuts a press changeover from 45 to 8 minutes.
躾shitsuke
The fifth S — sustaining discipline so the new standard becomes habit, enforced by routine rather than memory.
A five-minute end-of-shift 5S check logged on a board.
少人化shojinka
Flexible manning — adjusting the number of operators in a line to match demand, usually via standard work and multi-skilling.
Running two operators instead of three on a low-demand shift.
A quality level of 3.4 defects per million opportunities, and the disciplined method used to reach it by reducing variation.
A process at 4 sigma produces about 6,200 defects per million.
A layout drawing that traces the actual path of a person or part, showing travel that can be removed.
A tangle of lines proving an operator walks 2.4 km per shift.
Variation from an identifiable, unusual event — a new operator, a bad batch, a sensor fault. It is investigated, not averaged away.
One shift with cycle times of 70 seconds after a tool change.
標準仕掛
The fixed quantity of stock allowed inside a process, set as part of standard work and visibly controlled.
Exactly two bins between the press and the assembly station.
標準作業hyojun sagyo
The documented current best method, defined by takt time, work sequence and standard in-process stock.
A job instruction sheet posted at the station with key points.
Total Productive Maintenance — operators and maintainers together keeping equipment at its basic condition to eliminate unplanned stops.
Daily cleaning and lubrication done by the operator, not only by maintenance.
The physical reference that helps an operator feel the takt rhythm — a moving line, a sound, a light.
A beat every 30 seconds signalling the next unit.
タクトタイムtakuto taimu
The pace at which a product must be completed to meet customer demand: available time divided by demand.
27,000 seconds available, 900 units demanded — 30 seconds per unit.
七つの無駄nanatsu no muda
Transport, inventory, motion, waiting, overproduction, overprocessing and defects — later extended with unused talent.
A waste walk tallies each category and ranks them by pain.
Voice of the Customer — structured collection of what customers need, used to define CTQs and requirements.
Interviews and complaint data turned into ten measurable requirements.
価値
What the customer is willing to pay for, defined from the customer's point of view — not from the process's convenience.
The customer pays for a fitted part, not for the three inspections before it.
価値の流れ
All the actions, value-adding and not, required to bring a product or service from order to the customer.
From order entry through planning, machining, assembly and shipping.
見える化
Making the normal state and any deviation visible at a glance, so nobody has to ask how things are going.
Floor markings plus a board showing plan versus actual by hour.
山積みyamazumi
A stacked bar chart of work elements at each station, compared against takt to expose imbalance.
Station 3 stacked at 52 seconds against a 45-second takt.
横展開yokoten
Horizontal deployment — taking a proven improvement and applying it in other areas, adapted to local conditions.
A poka-yoke from line 2 fitted on lines 3 and 4.